|
Title: |
Made to Wait |
Description: |
This picture illustrates the benefits of ownership. KCS owns the Laredo International Bridge, so the UP train you see in the background will wait for a while longer to cross into Mexico even though it arrived a long time before the KCS train in the foreground. Two other UP trains would wait with the background train for this KCS stack train to cross. |
Photo Date: |
2/23/2023 Upload Date: 3/2/2023 9:48:56 PM |
Location: |
Laredo, TX |
Author: |
Andrew Barlow |
Categories: |
Roster,Yard,Track,Action |
Locomotives: |
KCSM 4099(SD70ACe) UP 8058(AC45CCTE) UP 2613(ET44AH) UP 7128(AC44CW) |
Views: |
244 Comments: 0 |
|
|
|
Title: |
Hurry Up and Wait |
Description: |
UP 7218 and 8058 have SB trains ready to go when cleared, but for now they both wait along with a 3rd SB UP train that sits further back up in the Laredo Yard. |
Photo Date: |
2/23/2023 Upload Date: 3/2/2023 10:02:13 PM |
Location: |
Laredo, TX |
Author: |
Andrew Barlow |
Categories: |
Roster,Yard,Track,Action |
Locomotives: |
UP 7218(AC44CW) UP 8058(AC45CCTE) UP 2613(ET44AH) |
Views: |
220 Comments: 0 |
|
|
|